Installation manual
1-4
ChargePoint® Charging Stations
Dual Circuit Wiring Diagram
The following illustration describes the wiring for installing a CT4000 on a dual circuit. Wiring for a single circuit installation is
described on the next page. Grounding requirements are described on page 1-6.
NOTE: Requires two dedicated circuits, each with its own two pole 40 A breaker. See Appendix B for lower power operation
options.
(13 mm)
(13 mm)