Installation manual

4-9
Installing the Head and Top Cap
Step 5: Use the Wizard to Complete the Installation
Power up the station to run the onscreen Installation Wizard, which helps you verify operation of the station and perform
some basic setup tasks.
NOTE: If the station does not power up, check that the head assembly’s blue rectangular connector is properly seated onto
the terminal block.
To complete the tasks in this Wizard, you must have completed ChargePoint Installer Certification training and received
your ChargePoint installer login. You will also need a smart phone with a camera, internet connectivity, and one of the
recommended QR Code scanning apps defined in the training.
If you have not completed the ChargePoint Installer Certification training, please STOP and contact ChargePoint to sign up for
training now.
The CT4000 Installation Wizard includes these tasks:
• Set language
• Enable Power Sharing (see Appendix B)
• Configure Power Select (see Appendix B)
• Apply the appropriate rating label (see Appendix B)
• Check for faults
• Test locking holsters
• Install cable clamps (see Appendix D)
• Pinpoint the station on a map
• Test network connectivity
The following images are an example of steps you will follow using the wizard: