Installation manual
2-2
ChargePoint® Charging Stations
Step 1: Check Boxes for Correct Contents
The bollard mount ships in two boxes as described below.
Main Body
• Main body, pre-assembled with mounting pole/base
plate, rubber bumper, and brackets (1)
• Adapter plastic cap (1)
• ¼”-20 x 1 ¼” screws (4)
Cable Management Kit
• Retractor assembly with pre-installed “EV CHARGING
ONLY” sign (1)
• Cable clamps (2 sets)**
**The type of cable clamps included will vary (see page 4-11).
Main Body
Cable Management Kit