Installation manual
4-13
Installing the Head and Top Cap
Step 7: Prepare the Station for Activation on ChargePoint
Before leaving the installation site, you must prepare the station for activation. To do so, you will need activation labels for
all gateway and non-gateway stations in this radio group. An activation label is included in the shipping box with each head
assembly (see page 4-2).
Preparing the station for activation on ChargePoint involves filling in the double-sided form on pages 4-15 and
4-16, detaching this sheet from this document, and providing it to the person responsible for activating the station on
ChargePoint. After doing so, the installation of the CT4000 charging station is complete.