Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
1 -5
Introduction
Shared Power Wiring Diagram
The following illustration describes the wiring for installing a dual port CT4000 on a shared single circuit. For this installation,
you will need the power sharing kit to allow both ports to share a two pole 40A circuit breaker. Wiring connections are
provided in Appendix C. Grounding requirements are described on page 1-6.
Wiring for a dual circuit installation, see the previous page.
TERMINAL BLOCK WITH
POWER SHARING JUMPERS INSTALLED
TERMINAL BLOCK WITH
POWER SHARING JUMPERS INSTALLED