Installation Manual

Table Of Contents
C-4
ChargePoint® Charging Stations
Step 3: Apply the Electric Rating Label
Apply the supplied Electrical Rating label to the left side of
the terminal block cover, just above the terminal block.
NOTE: Leave the cover in the raised position to facilitate
connection of the head assembly.
You are now ready to install the head assembly and top cap as described in Chapter 5.
IMPORTANT: When you finish installing the station, you must manually configure the station’s software for power
sharing, as described on the next page. Otherwise, the circuit breaker will trip when both charging ports are used.
Electrical Rating
label