Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
C-2
ChargePoint® Charging Stations
Step 1: Install the Jumpers
WARNING: Disconnect power before you begin.
• Push the black tab on the terminal block to release the terminal block cover, then slide the cover up until it locks into the
raised position:
• Insert the jumpers into the slots located near the upper edge of the terminal block. Using a large flat blade screwdriver,
push firmly on each jumper until you feel it lock into place.
IMPORTANT: Ensure both jumpers are fully seated. The jumpers should recede 1/8” (3 mm) below the outer
surface of the terminal block, as shown. If they are flush, they are not fully inserted.