Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
B-2
ChargePoint® Charging Stations
After Station Installation
To remove the sign after the station has been installed:
1. Use a T25 L-wrench to loosen the set screw on
each side of the top cap, as shown.
2. Pull the top assembly up and move it towards the
back of the retractor.
3. Slide the existing sign out of the grooves.
To install a new sign:
1. Slide the replacement sign into the grooves by
bending is slightly. See the previous page for sign
specifications.
2. Re-install the top assembly. Remember to tighten
the set screws.
Bend the sign
slightly to insert it
into the grooves