Installation Manual

Table Of Contents
1-2
ChargePoint® Charging Stations
Installation Sequence
Regardless of the specific type of CT4000 charging station you are installing, and the options included, the high level
installation sequence is the same:
PREPARE THE INSTALL THE INSTALL THE HEAD PREPARE THE STATION
INSTALLATION SITE MOUNTING OPTION AND TOP CAP FOR ACTIVATION
Before Installing
Ensure that the appropriate wiring, circuit protection, and metering is in place at the installation location by reviewing
the specifications, wiring diagrams, and grounding requirements in the remainder of this chapter.
Ensure that adequate CDMA (Verizon) or GSM (AT&T, Rogers) cellular coverage is available at the installation location. To
ensure adequate signal strength in underground garages or other enclosed parking structures, cellular repeaters may be
required.
For bollard mount charging stations, prepare the installation site by following the instructions in Appendix A. The
mounting template for the bollard is stapled into the center fold of this document and a PDF version is available at
www.chargepoint.com/support-installation-guides.php. Ensure the PDF version is accurate by printing it at 100% scale on
11” x 17” paper and then verifying at least one dimension.
Review the CT4000 Data Sheet (available at www.chargepoint.com/support-product-data-sheets.php).
Review the contents of this document to familiarize yourself with the contents of each shipping box and the required
installation steps.
Ensure the wiring, circuit
protection, and metering
is in place. Read the
remainder of Chapter 1. If
installing a bollard mount,
also read Appendix A.
Depending on the type of
station, follow the steps in
either:
Chapter 2 - Bollard
Chapter 3 - Wall mount
Follow the steps in
Chapter 4
Follow the steps in
Chapter 5