A-2
ChargePoint® Charging Stations
Install J-Bolts and conduit into concrete as illustrated. To
ensure correct alignment, use the template stapled into the
center fold of this document (illustrated below).
IMPORTANT:
• The concrete block must measure at least 24” (61 cm)
on all sides. Check local codes to ensure compliance.
• The J-Bolts threads must extend at least 2 ½” (6.4 cm)
above the concrete and 9” (23 cm) below the concrete.
• The conduit must extend 12” to 24” (30 to 61 cm)
above the concrete. Check local codes to ensure
compliance.
• You can also print a PDF version of the mounting
template, available at www.chargepoint.com/support-
installation-guides.php. Before using a self-printed
template, print at full scale on 11” x 17” paper and verify
at least one dimension.
Example of template (not to scale):
Conduit must extend
12-24” (30-61 cm) above
the concrete. Check local
codes.
J-Bolts must extend at
least 2 ½” (6.4 cm)
above the concrete and
9” (23 cm) below the
concrete.
Concrete block should
extend no more than 2”
(50 mm) above grade.