Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
A-1
A
Preparing the Installation Site
for a Bollard Mount
Before You Start
The ChargePoint® Charging Station’s bollard mount can be installed either:
• into the ground
• onto an existing concrete surface (on an intermediate floor only)
This appendix provides basic guidelines for preparing the installation site in both scenarios.
IMPORTANT: Always check local codes to ensure compliance. You may need to adjust the guidelines provided in this
appendix to comply with codes that apply at your installation location.
Installing Into the Ground
To install the CT4000’s bollard mount into the ground, you will
need:
• Concrete mix
• Three 5/8” galvanized J-Bolts at least 11 1/2” (29.2 cm)
long, with a minimum yield of proof strength of 80,000
psi (example bolt specification is F1554 Grade 105, red
painted end) with nuts and washers, as shown. Ensure
that J-Bolts, nuts, and washers are in compliance with all
applicable codes.
• Conduit at least 1 1/2” (38 mm) diameter. Ensure that
conduit is in compliance with all applicable codes.
• Base plate mounting template. This template is stapled
into the center fold of this document. A PDF version is
available at:
www.chargepoint.com/support-installation-guides.php
Ensure the PDF version is accurate by printing it at 100%
scale on 11” x 17” paper, and then verifying at least one
dimension.