Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
1
1-1
Introduction
This document provides step-by-step instructions on how to install a CT4000 ChargePoint® Charging Station.
Summary of Shipping Boxes
Each CT4000 charging station ships in four boxes:
Assembly name... Label on box says.... High level overview of box contents...
For Installation Instructions,
see...
Top Cap
IMPORTANT: Open
this box first—it contains the
printed Installation Guide
CT40XX-CAP*
Chapter 4
Body CT40X1-BD or CT40X3-BD
Includes a power sharing kit
(CT4020-PSHARE) that allows both
ports on a dual port station to share
a single 40A circuit.
Bollard Mount (CT40X1-BD):
Wall Mount (CT40X3-BD):
Chapter 2 - Bollard
Chapter 3 - Wall Mount
Cord Management Retractor CT4000-CMK
Chapter 2 - Bollard
Chapter 3 - Wall mount
Head CT40X0-HD* or CT40X0-HD-GW*
For gateway stations the box also
includes a Network Enablement
Kit, CT4000-NEK1 (US) or
CT4000-NEK2 (Canada)
Chapter 4
*The last two digits of the four-digit model number depends on the station’s features. The third digit (CT40X0) is “1” if the station has a single charging port, or ‘2”
if the station has two charging ports. The last digit (CT401X) is either a 1 (bollard mount) or 3 (wall mount).
NOTE: A more detailed list of the contents in each shipping box is provided in the associated chapter with the step-by-step
installation instructions.