Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
5-5
Preparing the Station for Activation on ChargePoint
Step 2: Document the Radio Groups
For each radio group, attach spare activation labels below to document how stations are organized. After completing the
next step on the reverse side, tear out this page and give it to the person responsible for activating the station. If installing
multiple radio groups, use one page for each radio group (this page is included in all CT4000 Installation Guides).
Customer Name
Site Address
Gateway
Non-gateway Non-gateway
Non-gateway Non-gateway
Non-gateway Non-gateway
Non-gateway Non-gateway
Non-gateway
NOTE: A radio group consists of one
gateway station and up to nine non-gateways.
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
Peel off sticker and place here
NOTE:
Gateways begin
with “GW-”
Non-gateways
begin with “NGW-”
"
After completing both sides, cut or tear along dotted line and give it to the person responsible for activating the station.