Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
5
5-1
Preparing the Station for Activation on
ChargePoint
Before You Start
Before leaving the installation site, you must prepare the station for activation. You need the following:
• a laptop or tablet computer
• installer user name and password for www.chargepoint.com
Overview of Steps
Preparing the station for activation on ChargePoint involves a few simple steps, summarized below and detailed in the
remainder of this chapter:
1. Pinpoint the Station (page 5-2)
2. Document the Radio Groups (page 5-5)
3. Complete the Post-installation Checklist (page 5-6)
When you have completed these steps and provided the necessary information to the person responsible for activating the
station on ChargePoint, the installation of the CT4000 charging station is complete.