Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
4-7
Installing the Head and Top Cap
Step 4: Connect Head Assembly
Pull to remove the yellow strap from the blue connector.
Connect the blue connector to the terminal block,
ensuring it “clicks” into place.
Push the cover down over the terminal block.
The blue
connector
“clicks” into
place on the
terminal block
Push the
cover down
over the
terminal
block