Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
4-5
Installing the Head and Top Cap
Step 2 cont’d: Prepare Head Assembly for Mounting
• Install the top cap
a) Place the top cap over the head assembly as shown, ensuring correct alignment.
b) Using a Phillips screwdriver, secure the top cap to the head assembly by inserting the two supplied screws into the
back of the top cap and tightening to 20 in-lbs.
Ensure correct alignment
so the top cap slides into
its secured position:
The small hole in each
of the two protruding
tabs on the bottom of
the top assembly must
slide and then snap
over the corresponding
nodule on the side of
the head assembly.
Tab
Tab
Nodule
Nodule