Installation Manual

Table Of Contents
4-3
Installing the Head and Top Cap
Step 1 cont’d: Check Boxes for Correct Contents
Head assembly
The station’s head assembly ships in a box containing:
Head assembly
Rubber plugs (4) - two of these are spares.
T25 Allen wrench (attached with a security tag on
the side of the head assembly)
Spare activation label (a duplicate label is attached
to the head assembly)
IMPORTANT: Keep the spare activation label
for future reference. It contains critical information
that is needed to document the radio groups when
preparing the station for activation on ChargePoint
(see page 5-5).
For gateway stations, a Network Enablement Kit is also
included:
SIM card
Installation instructions
An activation label is attached to the
head assembly. This duplicate label is
provided to simplify the step of
documenting the radio groups, as
described in Chapter 5. It includes
important information needed to
activate the station on ChargePoint.
GATEWAY STATIONS ONLY:
The shipping box also
includes an envelope
containing the Network
Enablement Kit.
SIM card
Installation
instructions