Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
4
4-1
Installing the Head and
Top Cap
Before You Start
Before installing the head and top cap, you must complete the installation of the main body and its cable management
system as described in a previous chapter. You need the following:
• Wire cutter
• #2 Phillips screwdriver
Overview of Steps
Installing the head and top cap involves a few simple step, summarized below and detailed in the remainder of this chapter:
1. Check Boxes for Correct Contents (page 4-2)
2. Prepare Head Assembly for Mounting (page 4-4)
3. Slide Head Assembly into Body (page 4-6)
4. Connect Head Assembly (page 4-7)
5. Verify the Station Operates Correctly (page 4-10)
6. Install Cable Clamps (page 4-10)
7. Secure Head Assembly (page 4-11)
When you have completed these steps, you will be ready to prepare the station for activation on ChargePoint, as described in
Chapter 5.