Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
3-2
ChargePoint® Charging Stations
Step 1: Check Boxes for Correct Contents
The wall mount ships in two boxes as described below.
Main Body and Mounting Kit
• Main body, pre-assembled (1)
• Mounting brackets with pre-installed screws and
flange bolts (2 sets)
NOTE: The packing box for the brackets serves as a
template for drilling mounting holes. Do not discard
packaging until you’ve completed Step 2.
• Slot cover (2)*
• Power sharing kit (use only if installing a dual-port
station on a single 40A circuit) (1)
*One extra slot cover is included.
Cable Management Kit
• Retractor assembly (1)
• Cable clamps (4)
• Phillips screws (10**)
**Two extra screws are included.
Main Body and Mounting Kit
Cable Management Kit