Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
2-6
ChargePoint® Charging Stations
Step 5: Prepare Retractor for Mounting
To prepare the retractor for mounting:
• Position the retractor packaging so that the bottom
of the retractor is near the base of the bollard.
IMPORTANT: Do not unwrap the cords.
• Remove and discard the two shipping screws from
the front face of the retractor.
NOTE: When you remove the shipping screws, the
retractor’s counterweights are free to move in either
direction. Therefore, do not tilt or carry the retractor
assembly with the top end lower than the bottom
end.
• Remove the foam packaging from the retractor.
• OPTIONAL: If necessary, remove or replace the EV
PARKING sign. See Appendix B.
Discard
shipping
screws
Top
Bottom
When handling, always
keep the top end higher
than the bottom end.