Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
2-5
Installing a Bollard Mount
Step 4: Install Main Body
To install the main body:
• Align the notches on the rubber bumper with the
front mounting nuts, then slide it all the way down
the pole until it is flush with the base plate. This
prevents any rocking motion between the main body
and the base plate.
• Slide the body over the mounting pole.
• Re-tighten the screws you loosened in Step 2 to
approximately 80 in-lbs using a 3/8” socket wrench.
IMPORTANT: Ensure the body is firmly aligned to
the bottom surface and that no movement (rocking) can
take place, even when significant pressure is applied.
Position
notches
(2) at
front
Re-tighten the 2 screws