Installation Manual
Table Of Contents
- Front Cover
- Table of Contents
- Introduction
- Installing a Bollard Mount
- Installing a Wall Mount
- Installing the Head and Top Cap
- Preparing the Station for Activation on ChargePoint
- Troubleshooting
- Appendix A: Preparing the Installation Site for a Bollard Mount
- Appendix B: Removing or Replacing the EV Charging Sign
- Appendix C: CT4000 Power Sharing Instructions
- Appendix D: Limited Product Warranty
2-2
ChargePoint® Charging Stations
Step 1: Check Boxes for Correct Contents
The bollard mount ships in two boxes as described below.
Main Body
• Main body, pre-assembled with mounting pole/base
plate, rubber bumper, and brackets (1)
• Adapter plastic cap (1)
• ¼”-20 x 1 ¼” screws (4)
• Power sharing kit (use only if installing a dual-port
station on a single 40A circuit) (1)
Cable Management Kit
• Retractor assembly with pre-installed “EV CHARGING
ONLY” sign (1)
• Cable clamps (4)
• Phillips screws (10*)
*Two extra screws are included.
Main Body
Cable Management Kit