Assembly Instructions

Suggested Tools:
Wrench and/or Ratchet Set
Approximate assembly time is 5-10 minutes
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
Remove bottom bolt from each side of handle (below triangle shaped thumb screws)
Loosen thumb screws and ip up handle
Replace bolts below thumb screws and tighten down
Tighten thumb screws completely
Handle
Bolts
Thumb
Screws
Figure A
* Note: If spring detaches from bail assembly,
simply re-attach (see Figure A).
Completed
Assembly
ASSEMBLY INSTRUCTIONS
Be sure gate control is in the closed position (do not hold bail down when lling)
Determine appropriate setting for material being used by reading the suggested setting on the material’s bag.
Be sure to read the instructions on the bag/box of the material youre spreading to identify accurate setting needed)
To begin spreading, start walking (about 3 mph pace) and pull the bail system down to open gate
To stop spreading simply let go of the bail and the gate will close
GENERAL OPERATING INSTRUCTIONS
BAFFLE OPERATING INSTRUCTIONS
Adjust bae by hand to block distribution accordingly. Front and sides can be adjusted independently.
Use wing nuts to adjust tension on baes.
AUGER INSTALLATION
Screw auger onto impeller sha. Screw auger retaining nut into auger hole with M6
socket driver. Tighten completely with wrench to secure.