Use and Care Manual

Completed Assembly
MATERIAL APPLICATION CHART
Calcium Chloride Pellets
Rock Salt
1-2
3-4
Particle Size/Material Spreader Setting
Slide the gate and linkage into the L ribs on hopper
keeping linkage attached to the gate.
4
Insert the “L-shaped” end of the linkage into the gate control on the handle and secure with
the cotter pin provided. Using pliers bend cotter pin to secure linkage to the gate control.
5
2E
Chapin Spreader Operators Manual - English