User's Manual Part 2

23
POWER WIRING CONTINUED...
POWER WIRING + CONNECT BATTERIES
WIRING
NOT PROVIDED. SEE ACCESSORIES.
The solar panel(s) must be located in an open area clear of obstructions and shading
for the entire day. The gate operator is not supported in northern climates where
temperatures reach below -4˚F. This is due to cold weather and a reduced number of
hours of sunlight during the winter months. Cycle rate may vary from solar chart for
areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for
best performance to ensure proper operation. For solar applications, a minimum of
two 10W solar panels in series and two 7AH batteries are recommended. For Zone 3
cold weather sites, two 33AH batteries are recommended (for Large Metal Control
Box (XLM) ONLY). We recommend LiftMaster low power draw accessories to minimize
power draw, refer to accessory page.
SOLAR PANEL(S)
NOT AVAILABLE
NOT AVAILABLE
1
1
1
2
3
3
2
Locate the solar/charge plug on the control board and remove the transformer
wires from the plug.
Connect the red (+) wire from the solar panel to the solar/charge plug (+).
Connect the black (-) wire from the solar panel to the solar/charge plug (-).
Plug in the solar/charge plug.
1
2
3
NUMBER OF CYCLES PER DAY (SOLAR)
Swing Gate Installation (6 ft. 1200 lb. gate/19 ft. 500 lb.)
Single Gate
CONFIGURATION ZONE 1
(6 Hrs
sunlight/day)
ZONE 2
(4 Hrs
Sunlight/day)
ZONE 3
(2 Hrs
Sunlight/
day)
Low Band
High Band
Expansion Board
1 Loop (LD7LP)
7AH Batteries (standard)
33AH Batteries (optional)
7AH Batteries (standard)
33AH Batteries (optional)
7AH Batteries (standard)
33AH Batteries (optional)
20W SOLAR PANEL
NOTE: 20W would be two 10W
(12V) panels in series.
120 154 76 96 33 38
117 151 74 93 30 35
✔✔
111 144 68 87 25 29
✔✔
109 142 66 84 23 27
✔✔✔✔
99 131 56 74 13 17
40W SOLAR PANEL
NOTE: 40W would be two 20W
panels in series.
156 202 101 128 45 54
154 199 98 125 42 51
✔✔
148 193 92 119 37 45
✔✔
145 190 90 117 35 43
✔✔✔✔
135 179 80 106 25 33
4
LOCK
+ -
ACCESSORY
POWER
ON SW.
EXP.
BOAR
CL S 2 S PP Y
24 O TS
- +
J5
+
SOLAR /
CHARGER
J15
+ -
BATT
- +
DC
POWER
ID RESET
ALARM
GROUND
BR GRN WT YE BLU RED
BR GRN WT YE BLU RED
Red
Black
(to solar panel)
Turn OFF AC power to the operator at the circuit breaker.
Plug the battery connector to the J15 plug labeled BATT(-)(+) DC(-)(+) on the
control board. The control board will power up.
Turn ON AC power to the operator.
CONNECT BATTERIES
The batteries are charged in the circuit by the transformer or solar panel.
1
2
3
STANDARD CONTROL BOX
Battery
Connector
J15 Plug
Dual Gates
20W SOLAR PANEL
NOTE: 20W would be two 10W
(12V) panels in series.
54 69 34 43 15 17
53 68 33 42 13 16
✔✔
50 65 31 39 11 13
✔✔
49 64 30 38 10 12
✔✔✔✔
45 60 25 33 6 7
40W SOLAR PANEL
NOTE: 40W would be two 20W
panels in series.
71 92 46 58 20 24
70 90 44 57 19 23
✔✔
67 87 42 54 16 20
✔✔
66 86 41 53 16 19
✔✔✔✔
62 81 36 48 11 15