Installation Guide

2
Preparation & Safety
Installer Agreement
What's In the Box
What's In the Door
Wire the Control Panel
Check Power
Set for Programming
Test Operation
Troubleshooting
LED Status
Diagnostics
Repair Parts
Notices
For More Help
Installation
Job Checklist
Thank you for being the caretaker of this exciting installation. Use these
steps to guide you through the job.
Use "White Glove" handling during loading and unloading, transport and
installation. Take EXTRA CARE to protect the electrical and mechanical
components sealed in the door during the installation process.
At the Install Site
Done
1. Reference the job order and review this complete
document.
2. Check with the Pet Parent that they have
downloaded the myQ® Pet Portal app and created
an account.
3.
Test power of the myQ® Pet Portal at the
intended outlet BEFORE INSTALLING the door.
4.
Install the door panel.
5. Wire and power up the Portal control panel.
6.
Set control panel for programming.
7. Instruct Pet Parent to access myQ® Pet Portal ,
and add the myQ® Pet Portal.
8.
Pet Parent tests operation found in the myQ® Pet
Portal Owner's Manual.
9. Sign o , send an image of this page, images of
the completed installation, and leave this manual
and the myQ® Pet Portal Owner's manual.
Pet Parent Date
Installer Date