Use and Care Manual

Table Of Contents
  
INSTALLATION of CABINET
1.
Carefully remove
all packing material. Place shelves
and hardware aside u
ntil needed.
2.
Determine desired location
of cabinet on wall. Mark
wall
to show wall opening size. Generally,
the
recommended height to the center of t he
cabinet is 64" from the f loor. Fig. 1
3.
CAUTION: Wall studs, plumbing or electrical lines
that
interfere must be removed o r relocated. Cut
wall opening, being careful not to damage the
surrounding wall surface. Insert framing to support
all plaster board edges
4.
Insert cabinet into wall opening in plumb and
centered position. Use a carpenter's level and shim
corners of cabinet if necessary.
5.
Once cabinet is inserted into wall, measure down 4"
from the top and t
he bottom of the cabinet. Center
tihe measurement on the sides o
f the cabinet. Fig 2.
6.
Using a drill bit, drill a total of 4 pilot holes in the
locations determined
in Step 5. Secure to wall studs through the 4
mounting holes inside cabinet (screws provided)