Installation Instructions
CertainTeed Vinyl Siding Installation Guide
125
Northwoods S7" and S9" Shakes 
Overview
The installation of a Northwoods Shakes or Shingles panel is 
unique in that the lap joint is hidden in the ribs between the shake 
or shingle pattern. Positioning the laps in the rib area requires that 
special installation procedures be followed to maintain product 
performance and aesthetics.
Panels must be installed from right to left. The left panel will overlap 
the right panel.
Factory laps
All lap joints are cut at a predetermined point on the panel during 
the manufacturing process. All male laps must be factory cut. 
Female laps may be field cut using the gap. However, do not cut 
along the edge of the gap; leave 3/16" of the gap for the overlap. 
NOTE: Do not drive center-pin nails tight. Leave 1/8"–1/16" 
between the nail head and the panel to allow the panel to 
move freely during normal expansion and contraction.
Center pinning
Vinyl siding expands and contracts as the temperature of the panel 
changes. To maintain the proper rib width at the lap joint, you will 
have to limit the movement of the panels. To do this, you must 
center pin each panel. Center pinning prevents the rib width at 
the lap joint from becoming too wide or too narrow.
Center pin each panel regardless of length
Install the siding according to one of the following methods, 
depending on whether the substrate is or is not fully nailable.
NOTE: The siding must be applied over a rigid sheathing that 
provides a smooth, flat surface or an underlayment (such as 
wood, wood composition, rigid foam or fiber sheathing) that 
is no more than 1" thick. Do not apply siding directly to studs. 
See pages 21 to 26 for additional information about proper 
sheathing and substrates.
Lock the right side panel into place on the starter strip. Allow room 
for expansion and contraction in all accessory pockets:
• 1/4" if the ambient temperature is above 40° F.
• 3/8" if the ambient temperature is below 40° F.
center pin mark










