User manual
Page 74
4.6.2 RF Link Test
This inspection verifies the RF link status, in accordance with Chapters 2 and 3 of this
manual.
• RF LED is green
• Management/CLI indication: “RF Operational – Up”
• Receive Signal Strength Indication (RSSI) achieved in Alignment Mode is within
+/-4dB of the expected value
• Carrier to Interference + Noise Ratio (CINR) is 15 or higher
• Link configuration (modulation, mode) is in accordance with plan requirements
4.6.3 Link Errors Test
This inspection verifies error-free operation of the
radio link.
• No radio errors on the RF Statistics counters
4.6.4 Ethernet Services Test
This inspection verifies correct Ethernet services flow and error-free operation.
• Connect PCs on both ends of the link and use software-based utilities to test for
packet-loss
• If available, connect a packet analyzer to the GbE port and verify that no packets
are lost
4.6.5 Management Verification
This inspection verifies proper management of the li
nk.
• Verify correct management/CLI connection to both local and remote ODUs
• Verify management access from remote NMS stations
4.6.6 Recording ODU Configuration
Perform the following steps after the FibeAir 70 ODU is commissioned and accepted:
• Copy the Running Configuration (currently active) to Startup Configuration.
• Save the configuration file for future records and backup.
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808295 Fax: +44 (0)1245 808299