User manual

Page 74
4.6.2 RF Link Test
This inspection verifies the RF link status, in accordance with Chapters 2 and 3 of this
manual.
RF LED is green
Management/CLI indication: RF Operational Up
Receive Signal Strength Indication (RSSI) achieved in Alignment Mode is within
+/-4dB of the expected value
Carrier to Interference + Noise Ratio (CINR) is 15 or higher
Link configuration (modulation, mode) is in accordance with plan requirements
4.6.3 Link Errors Test
This inspection verifies error-free operation of the
radio link.
No radio errors on the RF Statistics counters
4.6.4 Ethernet Services Test
This inspection verifies correct Ethernet services flow and error-free operation.
Connect PCs on both ends of the link and use software-based utilities to test for
packet-loss
If available, connect a packet analyzer to the GbE port and verify that no packets
are lost
4.6.5 Management Verification
This inspection verifies proper management of the li
nk.
Verify correct management/CLI connection to both local and remote ODUs
Verify management access from remote NMS stations
4.6.6 Recording ODU Configuration
Perform the following steps after the FibeAir 70 ODU is commissioned and accepted:
Copy the Running Configuration (currently active) to Startup Configuration.
Save the configuration file for future records and backup.
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808295 Fax: +44 (0)1245 808299