User manual
Caution:
Removing Connectors from the
To avoid accidental damage to the connector, always use the following order
to remove cable connections from the ODU (Refer to
1. Unscrew the Cable Inlet Portion (
release the gasket seal and remove tension from the cable connector.
2. Unscrew the Connector Outlet Portion (
its ODU port.
3. Remove the cable
Power Connection
Carefully screw the Connector Outlet Portion (
PWR port or alternatively, if a PoE connection is being used, the ETH1 port.
Tighten the Connector Outlet Portion securely by ha
Insert the power or PoE data connector into the port. The PWR LED color indicator
will turn green.
Screw the Cable Inlet Portion (
Connector Outlet Portion, taking care not to twist the c
the Cable Inlet Portion securely by hand. The Rubber Gasket Insert (
tighten to create a moisture
Secure the power supply cable into place using a cable tie.
Ensure that there is sufficient p
of the ODU during final alignment.
Wait for the FibeAir 70
ODU to boot up (about 5 seconds). ). The RF LED color
indicator will turn green when the boot is completed.
Other Connections
For each network connection, perfo
Carefully screw the Connector Outlet Portion (
appropriate port. Tighten the Connector Outlet Portion securely by hand.
use a wrench.
Insert the RJ45 or SFP connector into the port.
Screw t
he Cable Inlet Portion (
portion, taking care not to twist the connecting cable. Tighten the bottom portion
securely by hand. The Rubber Gasket Insert (
proof seal. Do not
use a wrench
Secure the network connection cable into place using a cable tie.
Ensure that there is sufficient play in the cabling to allow movement
of the ODU during final alignment.
Removing Connectors from the
FibeAir 70 ODU
To avoid accidental damage to the connector, always use the following order
to remove cable connections from the ODU (Refer to
Figure 2-4
):
1. Unscrew the Cable Inlet Portion (
) of the All-Weather Shell
first
release the gasket seal and remove tension from the cable connector.
2. Unscrew the Connector Outlet Portion (
)of the All-
Weather Shell from
its ODU port.
3. Remove the cable
connector from its port.
Carefully screw the Connector Outlet Portion (
) of the All-
Weather Shell into the
PWR port or alternatively, if a PoE connection is being used, the ETH1 port.
Tighten the Connector Outlet Portion securely by ha
nd.
Do not use a wrench
Insert the power or PoE data connector into the port. The PWR LED color indicator
Screw the Cable Inlet Portion (
) of the All-
Weather Shell onto the secured
Connector Outlet Portion, taking care not to twist the c
onnecting cable. Tighten
the Cable Inlet Portion securely by hand. The Rubber Gasket Insert (
tighten to create a moisture
-proof seal. Do not use a wrench.
Secure the power supply cable into place using a cable tie.
Ensure that there is sufficient p
lay in the cabling to allow movement
of the ODU during final alignment.
ODU to boot up (about 5 seconds). ). The RF LED color
indicator will turn green when the boot is completed.
For each network connection, perfo
rm the following steps:
Carefully screw the Connector Outlet Portion (
) of the All-
Weather Shell into the
appropriate port. Tighten the Connector Outlet Portion securely by hand.
Insert the RJ45 or SFP connector into the port.
he Cable Inlet Portion (
) of the All-
Weather Shell onto the secured top
portion, taking care not to twist the connecting cable. Tighten the bottom portion
securely by hand. The Rubber Gasket Insert (
) will tighten to create a moisture
use a wrench
.
Secure the network connection cable into place using a cable tie.
Ensure that there is sufficient play in the cabling to allow movement
of the ODU during final alignment.
Page 24
To avoid accidental damage to the connector, always use the following order
):
first
to
release the gasket seal and remove tension from the cable connector.
Weather Shell from
Weather Shell into the
PWR port or alternatively, if a PoE connection is being used, the ETH1 port.
Do not use a wrench
.
Insert the power or PoE data connector into the port. The PWR LED color indicator
Weather Shell onto the secured
onnecting cable. Tighten
) will
lay in the cabling to allow movement
ODU to boot up (about 5 seconds). ). The RF LED color
Weather Shell into the
appropriate port. Tighten the Connector Outlet Portion securely by hand.
Do not
Weather Shell onto the secured top
portion, taking care not to twist the connecting cable. Tighten the bottom portion
) will tighten to create a moisture
-
Ensure that there is sufficient play in the cabling to allow movement
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808295 Fax: +44 (0)1245 808299