User manual

Page 23
Cable Preparation
Before inserting a cable connector into the ODU, it must first be enclosed in a protective All-
Weather Shell, supplied with the FibeAir 70 unit.
The protective All-Weather Shell assembly is shown in Figure 2-4.
An identical All-Weather Shell is provided for each ODU connector: power supply, data
interface, and management interface.
Unscrew and remove the protective seals from each ODU cable interface opening
that will be used in the configuration.
1. Cable Inlet Portion 3. Connector Outlet Portion
2. Rubber Gasket Insert 4. Ethernet Cable
Figure 2-4 All-Weather Connecting Cable Shell Assembly
For each ODU cable connection, perform the following procedure:
a. Disassemble a protective shell by unscrewing its parts and carefully removing
the Rubber Gasket Insert () from the Cable Inlet Portion ()of the shell.
b. Thread the Ethernet Cable connector through the Cable Inlet Portion of the
shell, as shown in Figure 2-4.
c. Thread the cable connector completely through the Rubber Gasket (), as
shown.
d. Replace the Rubber Gasket Insert snugly into the Cable Inlet Portion of the
shell, gently pulling the cable connector and cable through the shell.
The cable is now prepared for insertion to the ODU.
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808295 Fax: +44 (0)1245 808299