Specifications
FibeAir 4800 Installation and Operation Guide Chapter 2 Installation and Setup
FibeAir 4800 Installation and Operation Guide 2-3
2.4 Equipment Required
The following is a list of the equipment required for installing the FA4800
hardware.
• RJ-45 crimp tool (if pre-assembled ODU/IDU cable is not used)
• Drill (for wall mounting only)
• IDU and ODU grounding cable
• 13 mm (½″) spanner/wrench
• ODU to IDU cable if not ordered (Outdoor class, CAT-5e, 4 twisted pairs)
• Cable ties
• Laptop running Windows 2000 or Windows XP.
2.5 Installation Sequence
The FA4800 system installation is achieved by following the steps listed below:
1. Installing ODUs at both sites of the link.
2. Assembling the ODU cable and connecting ODU to IDU at both sites.
3. Connecting the power.
4. Installing the management program on the network management station.
5. Aligning the ODUs.
6. Use the Link Budget Calculator Application
7. Running the Installation wizard from the management program.
8. Connecting user equipment to the local and remote IDUs.
Figure 2-1 illustrates a typical installation of FA4800 with an external antenna.