12. Electrical Setup
Secure control box to wall
1. Secure the control box to wall using the most
appropriate means.
Step 1
Control box
Preferably mounted
At eye level
Be sure to position the wall box so as
not to cause any hazards during and
after the installation.
Preferably mount the wall box:
!
Out of direct sunlight
!
At a comfortable working height
!
Away from garden sprinklers etc.
!
To allow easy access even when
the gate is ope.
Figure 15 Wiring Diagram
Figure 15 Wiring Diagram
1515
1515
S Sens1
S Sens2
M Sens1
M Sense2
Sens+
Sens-
Saf CLO
Saf OPE
Com
LCK/STP
TRG
PED
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
Light
Light
Batt +
Bat -
MTR M+
MTR —
MTR S+
MTR S-
MASTER
SLAVE
BLACKBLACK
REDRED
BLUEBLUE
PURPLEPURPLE
BLACKBLACK
REDRED
BLUEBLUE
PURPLEPURPLE
BLACKBLACK
REDRED
BLUEBLUE
PURPLEPURPLE
PURPLEPURPLE
BLUEBLUE
MASTER
S Sens1
S Sens2
M Sens1
M Sense2
Sens+
Sens-
Saf CLO
Saf OPE
Com
LCK/STP
TRG
PED
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
Light
Light
Batt +
Bat -
MTR M+
MTR —
MTR S+
MTR S-
THIN PURPLE
THIN RED or GREY
THICK BLUE
THICK BLACK
THIN BLUE or ORANGE
THIN BLACK
SLAVE
S Sens1
S Sens2
M Sens1
M Sense2
Sens+
Sens-
Saf CLO
Saf OPE
Com
LCK/STP
TRG
PED
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
Light
Light
Batt +
Bat -
MTR M+
MTR —
MTR S+
MTR S-
THIN PURPLE
THIN RED or GREY
THICK BLUE
THICK BLACK
THIN BLUE or ORANGE
THIN BLACK
Wiring Diagram for Basic Operation
Wiring Diagram for Basic Operation
Page 36
Page 36
Page 37
Page 37
For wiring diagram see page 39/40
Connect all wiring
2. Connect all the cables as required to the
control card. See pages 39 and 40.
3. When wiring each operator back to the
controller housing, it is recommended to
mount a small junction box adjacent each
operator. Terminate the cable provided on
the operator into this junction box and then
route a new cable from the junction box to
the controller housing.
Junction
Box
1. Always check that the circuit breaker in the electrical panel is in the
OFF position, and that all high voltage circuits (more than 42.4V)
are completely isolated from the mains supply before doing any
work.
2. Ensure that all low voltage systems (less than 42.4V) are suitably
protected from damage, by disconnecting all sources of power such
as chargers and batteries before doing any work.
3. All electrical work must be carried out according to the
requirements of all applicable local electrical codes. (It is
recommended that a licensed electrical contractor perform such
work.)
FIGURE 50
FIGURE 51
FIGURE 52
It is recommended that the installer
tie off the harness in such a way so as
to allow for a 350mm loop between
the cable exit at the back of the
operator and either the mounting
bracket or junction box, to minimise
the flexing of the harness. If a sharp
bend is introduced to the cable
harness, or a loop that is less than
350mm in diameter, the resulting
cable fatigue may cause the actuators
to behave erratically or to stop
operating altogether.