Specifications
16
Electric Steam Boilers
For Electric Steam Boilers, the relief valve should be vented to atmosphere
(generally through the roof). The piping used in the vent system must be of
adequate size to handle the capacity of the pressure relief valve and vent.
The vent piping system should incorporate a "drip pan elbow" to allow for
condensate drainage. The drip pan elbow should be piped to a to a suitable drain.
Piping the relief valve to a suitable vent or drain will prevent both water and heat damage
to the unit, as well as reduce the risk of injury from released steam. All pressure relief
venting and piping should comply with local codes. It is the responsibility of the
purchaser / installing contractor to assure this compliance.
Completing Installation
Installation of the CEMLINE Electric Water Heaters or Boiler is now complete. All
documentation supplied with the unit should be passed along to maintenance personnel for
future reference.










