Specifications
13 
In areas prone to seismic activity, it is recommended that the unit be mounted to the floor, 
according to recommended procedures for the site, to make the units less susceptible to 
seismic damage. 
Familiarization with the Unit and Components 
CEMLINE Electric Water Heaters and Boilers are designed to make installation a 
relatively simple procedure. Because the unit is "Packaged," after placing and mounting 
the unit, installation involves: 
  1.  connecting the cold water source to the cold water inlet; 
  2.  connecting the hot water or boiler water outlet to the hot water system; 
  3.  connecting the electric power source to the unit; 
  4.  piping the pressure / temperature relief valve to an acceptable vent or drain 
    system; 
Each unit is supplied with a Submittal Sheet, C.A.D. Drawings, and Wiring Diagrams that 
indicate the location and specifications for each connection that must be made. In 
addition, the drawings will enable the installer(s) to determine the flow direction of the 
water. 
Connecting the Cold Water Source and  
Hot / Boiler Water Outlet 
Note:  Before making any connections of cold water inlet or hot / boiler water outlet to 
  the unit, assure that all piping is clean and free of foreign material or scale. 
  This can usually be accomplished by "blowing out" the pipe. Any foreign 
  material or scale entering the unit can adversely affect operation and 
  performance. 
Cold Water Source 
The first step in the installation process is to connect the cold water source to the 
cold water inlet port. The exact location of this port for the specific unit, as well 
as inlet pipe diameter and thread size, can be determined from the C.A.D. 
Drawings supplied with the Submittal Sheet. 
A manual shutoff valve should be installed upstream on the cold water source as an 
isolation device. 










