Specifications
8 
General Notes and Warnings 
Notes 
v  This manual is intended to cover installation, operation, and maintenance 
procedures for CEMLINE CORPORATION Electric Water Heaters and Boilers. 
Since each unit is built to meet customer specifications, instructions may, at times, 
seem general in nature. Where procedures differ substantially between Series EHB 
and FTB Water Heater, or Electric Water and Steam Boilers, specific notes will be 
given. 
  If questions are not answered by this manual, or if specific installation, operation, 
and / or maintenance procedures are not clearly understood, contact CEMLINE 
CORPORATION for clarification before proceeding. 
v  All installation, operation, and maintenance procedures should be performed only 
by experienced, trained, and certified personnel. Personnel should be trained in 
and familiar with correct piping and electrical procedures and methods, and should 
be experienced in working with hot / boiler water systems. 
v  CEMLINE Electric Water Heaters and Boilers are designed for indoor use only, 
unless otherwise required by design specifications. Each unit requires at least two 
feet (2') of clearance around and above the unit. It should be located on a level 
surface (no more than one-half degree [½º] of slope), capable of supporting the 
total weight of the unit when filled to capacity. 
  The unit should be mounted to the floor following applicable architectural and 
local code requirements for the specific installation site. 
  In areas prone to seismic activity, it is recommended that the unit be mounted to 
the floor according to recommended procedures and codes for the site / location, 
to make the unit less susceptible to seismic damage. 
v  The high quality enamel paint, applied to the jacket of the unit, will provide years 
of protection against corrosion. If it is necessary to clean the outside of the unit, a 
mild cleaning agent should be used that will not damage the paint. 
v  Inspection procedures, troubleshooting, and periodic maintenance, as well as 
suggested intervals, are detailed on pages 24 to 59 of this manual. 
v  If the unit is damaged during installation, operation, or maintenance, complete the 
  following steps. 