INSTALLING PANELS 
INSTALLING PANELS 
Align the top left side below the arrow on 
the previously installed panel (See Figure 2). 
Apply pressure to middle butt and slide 
panel up until the top of the panel aligns 
with the bottom of the nail slot 
(See Figure 3). 
Apply pressure to bottom butt and slide 
panel up to fully engage (See Figure 4). 
Slide panel left or right to align witht the 
proper temperature mark (See Figure 5).
NAILING PROCEDURE
Do NOT nail tight. 
First, nail through center nail hole –  
not nail slot. If using partial panel, find 
center of nail hem and drive nail through 
center of nail hem (not in nail slot).
Next, nail every 8˝ through center of four 
nail slots. 
Last, nail through slot in right side tab.
NOTE: When nailing through slots, 
always nail in center of slot, and DO NOT 
NAIL TIGHT. Panels must be able to move 
to allow for expansion and contraction 
caused by temperature change.
1st Course, 1st Panel
Measure and cut 1˝ from bottom left end 
of panel (See Figure 1). Leaving ¼˝ gap 
at end of panel, insert left end of panel 
in to corner post and lock onto starter.  
Nail panel according to “NAILING 
PROCEDURE”.
1st Course, 2nd Panel
Use full panel and install according to 
“INSTALLING PANELS”. 
Nail panel according to “NAILING 
PROCEDURE”. 
Repeat for remaining full panels in 
1st course.
Last Panel of Each Course
Measure from the appropriate temperature 
mark on the previous panel into the corner 
post, allowing ¼˝ gap for movement. 
Mark and cut this distance from top left 
corner of panel. 
NOTE: To reduce waste, pieces cut from 
last panel on each course can be used 
as starter pieces on adjacent walls; or, 
if larger than 14˝ can to cut to length as 
starter piece for next course on the  
same wall. 
Install panel according to 
“INSTALLING PANELS” and 
nail according to “NAILING 
PROCEDURE”.
2nd Course (and all remaining even 
courses), 1st Panel
Measure from inside of corner post to 
EVEN line on nail hem of 1st panel of 
course below. Cut piece by measuring  
this distance from bottom right end of 
new panel. 
Install panel by aligning the bottom 
right end with the EVEN line on 
nail hem below. Install according 
to “INSTALLING PANELS” 
and nail according to “NAILING 
PROCEDURE”.
Install remaining panels in course.
3rd Course (and all remaining odd 
courses), 1st Panel
Measure from inside of corner post to 
ODD line on nail hem of 1st panel of 
course below. Cut piece by measuring this 
distance from bottom right of new panel. 
Install panel by aligning the bottom right 
side with the ODD line on nail hem below. 
Install according to “INSTALLING 
PANELS” and nail according to 
“NAILING PROCEDURE”.
Install remaining panels in course.
INSTALLING AROUND WINDOWS
Keep the panel pattern across all openings. 
When installing under windows, cut 
panels to required width. Use snap lock 
tool to punch tabs in top edge of panel. 
Cut small pieces of utility trim, Install and 
nail into J-channel. Install cut panels into 
trim, avoiding grooves on panels 
(See Figure 6).
Last Course on Wall
Cut panels to required width. Use snap 
lock tool to punch tabs in top edge of 
panel. Cut small pieces  
of utility trim, Install and nail into 
J-channel. Install cut panels into trim, 
avoiding grooves on panels  
(See Figure 6).
INSTALLING ABOVE 
HORIZONTAL SIDING
Options for transition include:
• Starter Strip with Drip Cap (see Figure 7).
• Field-formed T-Channel (see Figure 8).
• Lineals (see Figure 9).
NOTE: When starting with any channel 
or lineal, a base flashing should be used.
Fig.6
Fig.5
Fig.2
Fig.3
Fig.4
Fig.7
Fig.8
Fig.9