Specifications

UFM 070313
Page 18 | 1-800-343-9463
Building a Facade
The Ultimate FM Cooling Unit is set up to have a variety of Ducting Installation Options. The exhaust may be ducted
into the attic or out to the exterior of the house through the attic. The rst option to consider is using a standard
6”x14” Duct Boot and 8” diameter duct work for the exhaust followed by building a facade around the duct work.
Measure the space between the
cooling unit and the wall and add
the distance to these dimensions for
the total length.
Figure 5 below is an example that may be followed to create a facade to extend to the Ceiling using: 1/2” Plywood,
1/2” Drywall (2) 2x2, (2) 3x3.
INSTALLING THE DUCT WORK
FIGURE 5