Unit installation
HARBOR POINT WALL SPLIT DUCTLESS SYSTEMS
FIELD CHARGING 
Instructions: 
1.  Measure  suction  pressure  and  deter- 
mine evaporator-refrigerant temperature 
on R410A scale of low-side gauge. 
2.  Measure  suction-line  temperature  on 
suction line of the unit. 
3. Measure outdoor and indoor tempera- 
tures. 
4.  Determine  from  the  table  what  the 
superheat should be for the indoor and 
outdoor temperatures. 
5. Adjust charge if needed. Be sure unit is 
running at stabilized condition. 
Example of typical system operations: 
Note: 
When the system is in heat cycle, the refriger- 
ant charge is checked by using the liquid sub- 
cool method. Liquid sub-cool is the temperature 
below the high side pressure at its saturation 
temperature. 
16 
Cooling Cycle 
Conditions 
80°F DB/50% RH Indoors 
82°F DB Outdoors 
Return Gas Psig 
140 (49° F Saturated Temperature) 
Superheat 
Refer to supplied superheat chart (16° F) 
Heat Cycle 
Conditions 
70° F Indoors 
47° F Outdoors 
High Side Gas Psig 
350/375 (107/112° F Saturated Temperature) 
Sub-Cooling 
10 - 15° F 










