General
All equipment ordered by the customer
is installed.
The unit is level and secure.
The mains and control wiring are
complete and the circuit breaker and
GPO are turned ON.
All Controller functions for the
appliance operate.
All electrical or water connections are
to manufacturers specifications and
the relevant electrical or plumbing
standards and codes.
Unit - Ducted Evaporative Air
Conditioner
The water supply line has been
flushed to clear swarf and debris and
is free of leaks.
The tank is free of foreign matter and
debris and the water isolating tap is
turned ON.
Water drainpipe work is completed
and sealed.
The water basin fills with water and the
float valve closes correctly when the
water level is 65-70mm below the
overflow level.
The water pump operates correctly
when turned ON at the controller.
The Dialflo water bleed rate is
adjusted to suit local water conditions.
The Dump Valve (option). The tank
drains correctly when unit turns off.
The fan deck is correctly located and
the fan blade spins freely.
The fan operates through the entire
speed range.
The minimum fan speed is correctly
set.
Water distribution is even with the filter
pads fitted and the air conditioner
operating pump and fan.
Areas of high water pressure
(Exceeding 500Kpa) a water pressure
limiting valve must be fitted in
accordance with AS3500.
Consequential damage from high
water pressure is not covered by
warranty.
Ductwork
All ductwork is completed to plan,
correctly supported and airtight, with
no bend less than 1.5 x the ductwork
diameter.
Air distribution checked, dampers are
adjusted and all outlets correctly
adjusted and wiped clean.
All roof penetrations are fully sealed
and watertight.
Manhole cover replaced.
Site
All rubbish has been removed from
inside and on the roof.
Customer Hand Over
The operation of the Controller.
The need to open windows and doors
for the correct operation of Fresh Air
Conditioning
The operation of the bleed or dumping
system and it’s importance to operate
all the time in ducted fresh air
conditioning
Maintenance requirements