Instructions / Assembly

22 support@cedarsummitplay.com
Step 8: Attach Elbow Assemblies and TNR2 Slide
Support
Hardware
1 x #12 x 1” Pan Screw
1 x 1/4 x 1” Pan Bolt
(1/4” at washer & 1/4” lock nut - previously removed)
16 x 1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB6
Other Parts
1 x TNR3 Tube Support
4 x TNR2 Slide Clamp Ring
PB1
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round
recess and the lock nuts go through the side with the hexagonal recess. Keep all bolts loose until
further step.
A: Attach the two remaining Elbow Assemblies as instructed in Steps 5 and 6.
B: Place TNR Brace Assembly against (2618) Front Back Panel so it sits under the slide. It is not attached yet.
(g. 8.1)
C: On the fourth Elbow Assembly attached remove the pan bolt and nut which is facing the fort (installed in Step
3). (g. 8.1) The bolt will no longer be needed, but keep the lock nut.
D: Loosely attach TNR3 Tube Support (at the slightly bent end) to the Clamp Ring using 1 (PB6) 1/4 x 1” Pan
Bolt (with at washer and the previously removed lock nut). (g. 8.2)
E: Rotate TNR3 Tube Support and attach to (2622) End Panel Assembly using 1 (S6) #12 x 1” Pan Screw as
shown in g. 8.2.
F: Fully tighten screw and bolt.
Remove PB1 (1/4 x 3/4”
Pan Bolt) rst then install
PB6 (1/4 x 1” Pan Bolt
with at washer)
Lock
Nut
Attach 2
remaining
Elbow
Assemblies
Flat
Washer
Note: Flat
end down
TNR 3 Tube
Support
PB6
S6
2622
TNR Brace
Assembly
2618
S6
Fig. 8.1
Fig. 8.2