Instructions / Assembly

20 support@cedarsummitplay.com
2 x 1/4 x 2-1/4” Hex Bolt (1/4” lock washer, 1/4” at washer, 1/4” t-nut)
2 x 1/4 x 3” Lag Screw (1/4” at washer)
2 x #8 x 3” Wood Screw
4 x #8 x 2” Wood Screw
Hardware
Wood Parts
2 x SW Ground 5/4 x 4 x 14-1/4”
2 x Diagonal 1-1/4 x 3 x 22”
A: Loosely attach 1 (2606) SW Ground to each (2607) Diagonal with 1 (H10) 1/4 x 2-1/4” Hex Bolt (with lock
washer, at washer and t-nut) per board then place each (2607) Diagonal tight and ush to the front of (2627) SW
Wall Panel. (2606) SW Grounds to be ush to the bottom of (2627) SW Wall Panel. (g. 4.1 and 4.2)
B: Pre-drill pilot hole with a 3/16” drill bit then attach each (2607) Diagonal to (2627) SW Wall Panel with 1 (LS3)
1/4 x 3” Lag Screw (with at washer) per board, checking that they remain ush to outside edge. (g. 4.1 and 4.2)
C: Make sure bottom of each (2606) SW Ground is ush to bottom of (2627) SW Wall Panel then attach with 2
(S11) #8 x 2” Wood Screws and 1 (S4) #8 x 3” Wood Screw per board. Tighten all bolts. (g. 4.1 and 4.2)
1/4”
T-Nut
1/4” Flat
Washer
1/4” Lock
Washer
1/4” Flat
Washer
LS3
S11
S4
S4
Flush
Flush
Step 4: Attach SW Ground and Diagonal
LS3
2606
2607
S11
Fig. 4.1
2627
Fig. 4.2
2606
2607
2627
H10
H10