Installation Guide
52 support@cedarsummitplay.com
Step 24: Lower Wall Assembly
Part 3
G: Place1(2572)WindowSidetighttotheinsideof(0369)LowerDiagonalandtighttothetopof(2582)Cedar
Wallandanothertighttothetopof(2582)CedarWallandagainst(2575)DoorPostasshowning.24.8.Do not
screw these boards downyet.
H: Place(2574)DoorTopushtotheoutsideedgeof(0945)ShortPostandtightagainstthetopofeach(2575)
WindowSideasshowning.24.8.Aligntheoutteredgeof1(2572)WindowSideushtothenotchin(2574)Door
Topthenattacheach(2572)WindowSideto(0945)ShortPostand(2575)DoorPostwith5(S2)#8x1-1/2”Wood
Screwsperboardand(2574)DoorToptoboth(0945)ShortPostsand(2575)DoorPostwith6(S2)#8x1-1/2”
WoodScrews.(g.24.7&24.8)
I: Flushtotheoutsideedgeof(0945)ShortPostandtighttothetopof(2574)DoorTopattach(2573)FrontBoard
toboth(0945)ShortPostsand(2575)DoorPostwith6(S2)#8x1-1/2”WoodScrews.(g.24.7&24.8)
J:Flushtotheoutsideedgeof(0945)ShortPostandtighttothetopof(2573)FrontBoardattach(2576)FrontTop
toboth(0945)ShortPostsand(2575)DoorPostwith6(S2)#8x1-1/2”WoodScrews.(g24.7&24.8)
Hardware
Fig. 24.8
28 x #8 x 1-1/2” Wood Screw
S2
Wood Parts
2 x Window Side 1 x 4 x 16-1/4”
1 x Front Top 1 x 4 x 43-1/2”
1 x Front Board 1 x 6 x 43-1/2”
1 x Door Top 1 x 6 x 43-1/2”
2572
Tight
Front Wall
Flush
2576
0369
Fig. 24.7
x5per
board
2573
0945
2573
2576
0945
2575
S2
Flushto
notch
2582
Tight
Tight
x6per
board
2574
S2
2574
2572