Installation Guide
30 support@cedarsummitplay.com
Step 11: Middle Wall Assembly
Note: Pre-drill all holes using a 1/8” drill bit before installing the Lag Screws.
A:Onthegroundlayonedge2(0945)ShortPoststhenlooselyattach(0973)InnerFloorwith2(H8)1/4x
4-1/4”HexBolts(withlockwasher,atwasherandt-nut)and(0969)MiddleFloorinthetopholeswith2(H4)1/4
x4”HexBolts(withlockwasher,atwasherandt-nut)perboard,asshowning.11.1.Keep bolts loose.
B:Makesureassemblyissquareandthenfasten(0969)MiddleFloorto(0945)ShortPostswith2(LS3)1/4x
3”LagScrews(withatwasher).(g.11.2)
C:Tightenallbolts.
Wood Parts Hardware
2 x 1/4 x 4” Hex Bolt (1/4” lock washer, 1/4” at washer, 1/4” t-nut)
2 x 1/4 x 4-1/4” Hex Bolt (1/4” lock washer, 1/4” at washer, 1/4” t-nut)
2 x 1/4 x 3” Lag Screw (1/4” at washer)
2 x Short Post 2 x 4 x 84”
1 x Inner Floor 5/4 x 4 x 41-1/2”
1 x Middle Floor 1 x 5 x 41-1/2”
0945
0969
0973
LS3
H4
H8
Fig. 11.2
0969
1/4”
t-nut
1/4”at
washer
1/4”lock
washer
H8
0973
x2
x2
0945
0945
0969
Notice the hole locations
1/4”at
washer
x2
Fig. 11.1
H8
Notice location of
pilot holes
LS3