Installation Guide

87 support@cedarsummitplay.com
Step 43: Attach Exit End Assembly to Fort
Note: When installing Pan Bolts make sure to
look at holes so bolts go through the side with
the round recess and the lock nuts go through
the side with the hexagonal recess. Keep all bolts
loose until further step.
A:
FittheExitEndAssemblytothelastElbow
Assemblybyliningupthearrowsoneachassembly.
Noticetheelboworientation.(g.43.1)
B: Attach1TNR2SlideClampRingtothetopofthe
joinedAssembliesusing3(PB1)1/4x3/4”PanBolts
(withlocknut),makingsuretomatchthearrowsup
withtheendoftheclampring(whereaseamwillbe)
asshowning.43.1.
Use Quadrex Driver as a guide pin for each hole
before inserting bolt.
C:
Attach1TNR2SlideClampRingtothebottomof
thejoinedAssembliesusing3(PB1)1/4x3/4”Pan
Bolts(withlocknut),makingsuretomatchthearrows
upwiththeendoftheclampring(whereaseamwill
be)asshowning.43.2.
D:Connectthe2TNR2SlideClampRingstogether
in2spotsusing1(PB1)1/4x3/4”PanBolt(withlock
nut)perhole.Makesureseamsandarrowslineup
andthentightenallbolts.(g.43.3).
Hardware
8 x 1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB1
Other Parts
2 x TNR2 Slide Clamp Ring
Bottom Slide Bolt Holes
After the clamp rings
are attached to the
elbows, fasten them
end to end with two
pan bolts and lock nuts
PB1
Lock
Nut
Make sure arrows
are aligned
Elbow
Assembly
Top Slide Bolt Holes
ExitElbow
Assembly
PB1
PB1
Lock
Nut
Lock
Nut
Fig. 43.1
Fig. 43.2
Fig. 43.3