Installation Guide

86 support@cedarsummitplay.com
Step 42: Attach TNR2 Slide Exit to Exit Elbow Assembly
A:InsertangeofExitElbowAssembly(slideelbow)intotheslotsonTNR2SlideExit.(g.42.1)
B: RotateSlideExitanduseQuadrexDriverasaguidepinsotheholesarealignedandattachwith5(PB1)1/4
x3/4”PanBolts(withlocknuts)startingwiththebottommiddleholeandworkingupeachside.(g.42.2and
42.3)
C:
Atthispointmakesurealltheslideboltsaretight.Use a 7/16” open end wrench to hold nut and then
tighten bolt with Quadrex Driver on Clamp Rings.
Hardware
5 x 1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB1
Other Parts
1 x TNR2 Slide Exit
ExitElbow
Assembly
Bottom of Slide Views
TNR2
SlideExit
PB1
Lock
Nut
PB1
Lock
Nut
Start with
this bolt
Slot of TNR2
Slide Exit
PB1
Fig. 42.1
Fig. 42.3
Fig. 42.2