Installation Guide

85 support@cedarsummitplay.com
Step 41: Attach SL Support to Ground Back
Hardware
1 x 1/4 x 1-1/4” Pan Bolt
PB2
A: Use(1450)SLSupportasaguidetojudgetheproperboltlocation,removethebottompanboltandnut.
The bolt will no longer be needed, but keep the lock nut. (g.41.1and41.2)
B:AttachthetopoftheTNR2PostMounttoTNR2SlideClampRingusing1(PB2)1/4x1-1/4”PanBolt
(withthepreviouslyremovedlocknut).(g.41.2)
C:Tightenboltsin(1450)SLSupport.(g.41.2)
PB2
TNR2Post
Mount
Remove PB1 (1/4 x 3/4”
Pan Bolt rst then install
PB2 (1/4 x 1-1/4” Pan Bolt
with previously removed
lock nut)
1/4”LockNut
1450
1450
Fig. 41.2
Fig. 41.1
Tighten
thesebolts