Installation Guide
84 support@cedarsummitplay.com
Step 40: Attach Elbow Assemblies and TNR2 Slide
Support
Hardware
1 x #12 x 1” Pan Screw
1 x 1/4 x 1” Pan Bolt
(1/4” at washer & 1/4” lock nut - previously removed)
16 x 1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB6
Other Parts
1 x TNR2 Slide Support
4 x TNR2 Slide Clamp Ring
PB1
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round
recess and the lock nuts go through the side with the hexagonal recess. Keep all bolts loose until
further step.
A:
AttachthetworemainingElbowAssembliesasinstructedinSteps38and39.
B: OnthefourthElbowAssemblyattachedremovethepanboltandnutwhichisfacingthefort(installedinStep
36).(g.40.1)The bolt will no longer be needed, but keep the lock nut.
C:
LooselyattachTNR2SlideSupport(attheslightlybentend)totheClampRingusing1(PB6)1/4x1”Pan
Bolt(withatwasherandthepreviouslyremovedlocknut).(g.40.2)
D:RotateTNR2SlideSupportandattachto(2428)SLBlockusing1(S6)#12x1”PanScrewasshowning.
40.2.
E:
Fullytightenscrewandbolt.
Remove PB1 (1/4 x 3/4”
Pan Bolt rst then install
PB6 (1/4 x 1” Pan Bolt
with at washer)
Lock
Nut
Attach 2
remaining
Elbow
Assemblies
Flat
Washer
Note: Flat
end down
TNR2Slide
Support
PB6
S6
S6
2428
Fig. 40.1
Fig. 40.2