Installation Guide
81 support@cedarsummitplay.com
Step 38: Attach Elbow Assembly to Flange Assembly
Part 2
Note: When installing Pan Bolts make sure to look at holes so bolts
go through the side with the round recess and the lock nuts go
through the side with the hexagonal recess. Keep all bolts loose until
further step.
C:
Attach1TNR2SlideClampRingtothebottomofthejoinedAssemblies
using2(PB1)1/4x3/4”PanBolts(withlocknut)ononesideand1(PB1)
1/4x3/4”PanBolt(withlocknut)intheotherside,makingsuretomatch
thearrowsupwiththeendoftheclampring(whereaseamwillbe)as
showning.38.5,38.6and38.7.
D: Connectthe2TNR2SlideClampRingstogetherin2spotsusing1
(PB1)1/4x3/4”PanBolt(withlocknut)perhole.Makesureseamsand
arrowslineupandthentightenallbolts.(g.38.8and38.9).
Hardware
5 x 1/4 x 3/4” Pan Bolt
(1/4” lock nut)
PB1
Other Parts
1 x TNR2 Slide Clamp Ring
DO NOT USE
USE IMAGE PG 123
DO NOT USE
USE IMAGE PG 123
DO NOT USE
USE IMAGE PG 123
Bottom Slide Bolt Holes
Make sure
arrows are
aligned
After the clamp rings
are attached to the
elbows, fasten them
end to end with two
pan bolts and lock nuts
PB1
Lock
Nut
PB1
(Side not shown)
PB1
Lock
Nut
Lock
Nut
Fig. 38.6
Fig. 38.8
Fig. 38.9
Fig. 38.7
Fig. 38.5