Installation Guide
64 support@cedarsummitplay.com
Step 28: Attach Hand Grip
Pre-drill all holes using a 3/16” drill bit before installing the Lag Screws.
A:
OntheBackWallmeasure5-1/2”upeach(1400)Postfromthetopofoorboardsthenattach1HandGrip
withoneach(1400)postwith2(LS1)1/4x1-1/2”LagScrews(withatwasher)perHandGrip.(g.28.1)
Back Wall
1400
Fig. 28.1
1/4”at
washer
HandGrip
Hardware
4 x 1/4 x 1-1/2” Lag Screw (1/4” at washer)
LS1
Other Parts
2 x Hand Grip
5-1/2”
2586
1400
Floor
Boards
LS1
LS1
Hand
Grip